Search results
-
Prodesdir (B) (Portuguese Version, Portugal)
Rosanas, Josep MariaCase C-685-PPAccounting and ControlThis case is about a situation that follows that of the Prodesdir A case study. Demand has grown considerably and may reach production capacity. Students are asked how they will manage this situation and whether it is logical from an accounting perspective to distribute the fixed costs according to the actual production volume. As in the previous case study, the use of a spreadsheet is recommended for case preparation and presentation.Starting at €5.74
-
Prodesdir (C) (Portuguese Version, Portugal)
Rosanas, Josep MariaCase C-686-PPAccounting and ControlThis case is a continuation of the previous two. It asks the students to think of how they can manage a situation where the increase in demand has made the company reach its capacity limit in at least two aspects: qualified labor and machinery. This case can be used to introduce basic concepts of linear planning. As in the two case studies above, the use of a spreadsheet is recommended.Starting at €5.74
-
Prodesdir (A) (Portuguese Version, Portugal)
Rosanas, Josep MariaCase C-684-PPAccounting and ControlThis is the first in a series of three cases (Prodesdir A, B and C) that teach the fundamental concepts of cost accounting. The company Prodesdir has three products and is working below its capacity. One of its three products is unprofitable, according to the complete cost analysis. Students are asked to think of possible measures to be taken and do exercises such as calculating the break-even point, preparing the profit and loss account, etc.Starting at €8.20
-
Fibertec (Portuguese Version, Brazil)
Cugueró-Escofet, Natàlia; Rosanas, Josep MariaCase C-766-PBAccounting and ControlOn the one hand, this case study is designed as a vehicle for understanding costs already incurred and opportunity costs at Fibertec. On the other hand, it addresses the decision of whether to close one of its departments and outsource it to an engineering company. In addition, this document allows for an analysis of what might be the best decision using different criteria (economic, level of risk, people involved, etc.). To calculate the differe...Starting at €8.20